|

Frederick County Public Schools should be proud of their
addition to the scores of high schools in the county. Construction began in 2001 with the grand opening to be celebrated
with the beginning of the 2003 - 2004 school year.
What a beautiful project.

Our scope included the exterior structural framing as well as numerous
interior specialty products, adding challenge and interest for our well-qualified craftsmen. Details such as "Main Street" consist of a two-story hallway with skylights,
acoustical panels, and radius walls and bulkheads. Other interesting aspects of the school includes the Choral Room with
sound panels on the walls and fiberglass reflective ceiling panels placed in the acoustical ceilings. Highlighting the skill of
our craftsmen, the auditorium design includes curved and barreled bulkheads and drywall reflective panels to help balance the
acoustics. Raised platforms were also constructed the in the Computer Labs by our craftsmen.
Frederick County Public Schools did not miss a trick in this design. All in all the school is first rate, in design as well as construction.
[Back to Projects]
|